AutoBuild
Our Projects
Mall of Egypt | Egypt | Shop Drawings | Reinforced Concrete Shop Drawings | 2014 | Commercial | Majid Al-Futtaim | MZECH | Besix-Orascom | N/A | |||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Grand Egyptian Museum Phase III | Egypt | Design | Structural Steel Connections Design | 2014 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | ||||
Grand Egyptian Museum Phase III | Egypt | Shop Drawings | Reinforced Concrete Shop Drawings | 2013 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | N/A | |||
Grand Egyptian Museum Phase III | Egypt | BIM | Concrete and Reinforcement Model of Roof | 2014 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | N/A | |||
Tut Ankhamun Facsimile | Egypt | Design | Reinforced Concrete and Structural Steel Design | 2013 | Museum | Factum Art | Waly Center Architecture & Heritage | TBD | N/A | |||
Pyramids - Visitors Center and Cultural Center | Egypt | Construction Management | Civil Site Supervision | 2014 | Museum | Ministry of Antiquities | Waly Center Architecture & Heritage | TBD | N/A | |||
Giza North | Egypt | BIM-Tekla Steel Structure | Modeling and Quantity Surveying of Structural Steel | 2014 | Power Plant | Ministry of Power and Electricity | PGESCO | Besix-Orascom | NSF | |||
Safwa II Cement Plant - Plate Work | KSA | BIM-Tekla Steel Structure | Modeling and Quantity Surveying of Lightweight Structural Steel | 2014 | Heavy Industry | LAFARGE | ACE Moharram-Bakhum | Polysius | NSF | |||
Safwa II Cement Plant - Structural Steel | KSA | BIM-Tekla Steel Structure | Modeling and Quantity Surveying of Structural Steel | 2014 | Heavy Industry | LAFARGE | ACE Moharram-Bakhum | Polysius | NSF | |||
Cairo International Airport - Terminal Building 2 | Egypt | BIM-Tekla Steel Structure | Modeling and Quantity Surveying of Structural Steel | 2014 | Airport | Cairo Airport Company | Engineering Consultant Group (ECG) / Netherland Airport Consultant (NACO) | Limak | NSF | |||
Grand Egyptian Museum Phase III | Egypt | BIM-Tekla Steel Structure | Formwork Templates | 2014 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | N/A | |||
Siemens - Medical Equipment | Lebanon | BIM-Revit | Modeling of families for Medical Equipment | 2014 | Hospital | SIEMENS | Paracon Consultants | CCC | N/A | |||
Steel Review | KSA | Design-Steel Structure | 3rd Party Check of Structural Steel Design | 2014 | Power Plant | KSA | N/A | ORASCOM-KSA | N/A | |||
Ain El Kebira Cement Plant | Algeria | BIM-Tekla Steel Structure | Modeling and Quantity Surveying of Structural Steel | 2014 | Power Plant | GICA - Groupe Industriel des Ciments d'Algerie | N/A | Polysius | N/A | |||
Grand Egyptian Museum Phase III | Egypt | BIM-Tekla Reinforced Concrete | Formwork Templates-Extension | 2015 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | N/A | |||
ERC Refinery Project | Egypt | BIM-Tekla Steel Structure | Modeling and Quantity Surveying of Structural Steel | 2015 | Refinery | Egyptian Refining Company (ERC) S.A.E. | GS E&C MISTUI & Co LTD. | N/A | N/A | |||
Ain El Kebira Cement Plant | Algeria | BIM-Tekla Steel Structure | Modeling and Quantity Surveying of Structural Steel- Extension | 2015 | Cement Factory | GICA - Groupe Industriel des Ciments d'Algerie | N/A | Polysius | NSF | |||
Power Plant Saudi | KSA | Design-Steel Structure | 3rd Party Check of Structural Steel Design | 2014 | Power Plant | KSA | N/A | KSA | N/A | |||
SolarizEgypt | Egypt | Design & Fabrication | Steel Structure Design & Fabrication | 2015 | 36.8KW Residential Solar System Structures | N/A | DESIGNAZER | DESIGNAZER | N/A | |||
St. Boktor Monastery | Egypt | Site Supervision | Client's Representative | 2015 | Monastery | Coptic Orthodox Church | EGYCAN | N/A | N/A | |||
Water Reservoirs Project- Confidential Location | Qatar | Shop-drawing | Reinforced Concrete Shop Drawings | 2015 | Water Reservoirs | Qatar General Electricity and Water Corporation | Confidential | Confidential | Confidential | |||
Grand Egyptian Museum Phase III | Egypt | Design | Roof Structural Steel Connections Design | 2015 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | N/A | |||
Grand Egyptian Museum Phase III | Egypt | BIM | Roof Structural Steel Connections Design | 2015 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | N/A | |||
Iowa Fertilizer Pipe line | US | Steel Structure Design | Steel Structure Design | 2016 | Factory steel structure | Iowa Fertilizer Company | ORASCOM-USA | NSF | ||||
New Entity- New Capital Cairo | Egypt | Shop drawing | Reinforced Concrete Shop Drawing | 2016 | Hotel | Armed Forces-Financial Affairs committee | ECG | Orascom | N/A | |||
New Entity- New Capital Cairo | Egypt | Shop drawing | Reinforced Concrete Shop Drawing | 2016 | Confidential | Armed Forces-Financial Affairs committee | ECG | Orascom | NCC | |||
Saudi-Based Project | KSA | Quantity Surveying | Preparing B.O.Q for Tender | 2016 | Residential Project | Confidential | Confidential | Orascom | N/A | |||
Mall of Egypt | Egypt | Quantity Surveying | Concrete and Reinforcement QS | 2016 | Commercial | Majid Al-Futtaim | HILL-EHAF | Orascom | N/A | |||
Grand Egyptian Museum Phase III | Egypt | Design | Steel Structure | 2016 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | BASCO | |||
Grand Egyptian Museum Phase III | Egypt | Modeling | Steel Structure | 2016 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | HAZ Marble | |||
Wind Breaker | Egypt | Contracting, concrete works | Excavation, reinforced concrete, steel columns manufacturing and erection. | 2017 | Cement Plant | Titan | DesignBuild | Tech Trade | N/A | |||
Riyadh Metro Project | Taiwan | BIM Implementation/ | Architectural & MEP coordination, modelling and shopdrawing. | 2017 | Metro Stations | High Commision for the development of Arriyadh | Bechtel | Bechtel-Almabani-CCC-Siemens JV | N/A | |||
Grand Egyptian Museum Phase III | Egypt | Design | Steel Structure Design | 2017 | Museum | Ministry of Antiquities | Orascom | Astron | ||||
Riyadh Metro Project | KSA | BIM Implementation/ | Architectural & MEP coordination, modelling and shopdrawing. | 2018 | Metro Stations | High Commision for the development of Arriyadh | Bechtel | Bechtel-Almabani-CCC-Siemens JV | N/A | |||
Grand Egyptian Museum Phase III | Egypt | Design | Steel Structure Design | 2018 | Museum | Ministry of Antiquities | HILL-EHAF | Besix-Orascom | Astron | |||
Marassi Project Phase I | Egypt | Coordination & Shop drawing | Coordination, Concrete Dimension, Reinforced concrete and Architecture shopdrawing. | 2018 | Resort | EMAAR | Cosmos | Orascom | N/A | |||
Marassi Project Phase II | Egypt | Coordination & Shop drawing | Coordination, Concrete Dimension, Reinforced concrete and Architecture shopdrawing. | 2019 | Resort | EMAAR | Cosmos | Orascom | N/A | |||
AlBorouj | Egypt | Coordination & Shop drawing | Coordination, Concrete Dimension, Reinforced concrete and Architecture shopdrawing. | 2019 | Residential Compound | Alborouj | N/A | Orascom | N/A | |||
BAPCO | Bahrain | BIM-Tekla Steel Structure | Steel modeling, reviewing & detailing | 2020 | Steel structure for oil refinery | BAPCO | N/A | ASSENT | N/A |